All States New York NY Metropolitan Transportation Authority (MTA)

Special District  New York · Account Intelligence

NY Metropolitan Transportation Authority (MTA)

The largest public transit authority in the US: the MTA runs the NYC subway, buses, the Long Island Rail Road, Metro-North, and the region's bridges and tunnels — a sprawling OT-heavy operation now executing a record $68.4B capital program with a deep technology, signal-modernization, and cybersecurity agenda.

New York, NY Last updated Oct 1, 2026
Largest US transit authorityRole~$21.3BOperating budget (2026)$68.4BCapital program (2025–29)OMNY (MetroCard retired)Fare system

Overview

The Metropolitan Transportation Authority (MTA) is a New York State public-benefit corporation and the largest public transportation provider in the United States, serving a 5,000-square-mile region in and around New York City. It operates through a family of agencies: New York City Transit (subway and buses), the Long Island Rail Road, Metro-North Railroad, MTA Bus, and MTA Bridges and Tunnels, moving millions of riders on an average weekday.

For a technology seller the MTA is best understood as a vast operational-technology (OT) environment — signals, train control, tolling, power, and rolling stock — layered with a large enterprise IT and data estate across six operating agencies. The MTA carries a roughly $21.3B annual operating budget and is mid-execution on a $68.4B 2025–2029 capital program, the biggest in its history, with the bulk aimed at state-of-good-repair: signal modernization, station accessibility, substations, and rolling stock.

Congestion pricing (the Manhattan Central Business District tolling program live since January 2025) is now a dedicated funding source feeding capital improvements. The MTA governs itself through a board of state- and locally-nominated members, and major contracts require board approval — a structural fact that shapes every large technology deal.

How this account buys
  • MTA IT / Office of the CTO (Rafail Portnoy) is the technology buying center across all six operating agencies
  • Agency-level procurement runs the actual solicitations — confirm the right buying entity (HQ vs. NYC Transit vs. LIRR vs. Metro-North vs. Bridges & Tunnels) before pursuing
  • MTA Board approval is the gate for contracts of size, via the monthly competitive-procurements action list
  • Capital-program funding ($68.4B 2025–2029) vs. operating budget determines which pool pays — signal/OT modernization sits in capital, enterprise IT mostly in operating
  • Competitive RFP/IFB is the default vehicle; NYS OGS piggyback and single-source/emergency routes exist but are narrower exceptions

Where Dell Can Play

  • Map the MTA as an OT-heavy enterprise: lead with rugged/edge compute, networking, and data infrastructure for signal modernization (CBTC) and tolling, not just back-office IT.
  • Engage the Office of the CTO on IT consolidation, data platforms, and AI analytics across the six agencies — a standardization story that fits ISG and AI-infrastructure.
  • Bring an IT/OT cybersecurity narrative tied to the MTA's OT Cybersecurity Program and New York State's cyber strategy — asset visibility, segmentation, and resilience for safety-critical systems.
  • Plan for MTA Board approval timelines and confirm the buying entity (HQ vs. NYC Transit vs. agency) early; align pursuits to the $68.4B capital program's state-of-good-repair priorities.
  • Track federal-funding risk to the capital plan and congestion-pricing revenue — both shape which technology workstreams stay funded; forecast accordingly.

Budget & Fiscal

The MTA runs two distinct budgets: a roughly $21.3B annual operating budget (the largest of any US transit agency) and a separate multi-year capital program funded through dedicated taxes, federal aid, congestion-pricing revenue, and bonding. Technology and OT spend lives in both — enterprise IT in operating, and the heavy signal/train-control/tolling modernization in capital.

~$21.3B
Operating budget (2026)
Annual; largest of any US transit agency
$68.4B
2025–2029 capital program
Record-size; ~90% to state-of-good-repair
~$1.5B
Annual congestion-pricing target
Net tolling revenue dedicated to capital, supporting ~$15B in financing

Initiatives & Priorities

Signal modernization (CBTC)

The MTA is replacing decades-old fixed-block signals with Communications-Based Train Control across multiple subway lines (recent awards on the Fulton/Liberty corridors, plus ongoing Queens Boulevard and G-line work). This is the flagship OT-modernization track — compute, networking, and cybersecurity at the edge of a safety-critical system.

OT Signal Modernization Capital
OMNY fare-collection transition

OMNY (contactless tap-and-go) has fully replaced the MetroCard, with sales of the 30-year-old card ending December 31, 2025 and 90%+ of riders already on OMNY. The system spans payments infrastructure, account-based ticketing, and the supporting data platform.

Payments Data Customer
OT / cybersecurity hardening

The MTA runs an Operational Technology Cybersecurity Program — recognized in New York State's statewide cybersecurity strategy — focused on protecting safety-critical signals, tolling, and power systems as IT/OT converge. Asset discovery, SIEM/IDS tuning, and incident-response readiness are active workstreams.

Cybersecurity OT Resilience
IT consolidation, data & AI analytics

Under the CTO, the MTA continues consolidating, modernizing, and standardizing its technology environment across six agencies, extending into AI analytics and data-driven operations. A clear lane for enterprise infrastructure, data platforms, and AI compute.

Data Center AI Modernization

Procurement

The MTA procures through its own competitive process governed by NY Public Authorities Law (PAL 1209 / 1265-a) and All-Agency procurement guidelines — not a state cooperative vehicle. Large contracts require MTA Board approval, and competitive procurements appear on a monthly board-approval list. Plan for board timelines and confirm the right buying entity (HQ vs. NYC Transit vs. an agency) for any technology pursuit.

Vehicle / gateWhat it means for Dell
Competitive RFP / IFBThe default path for goods, services, and IT — RFPs gauge market competition and are scored by selection committees on technical qualifications, price, and other factors; public works and goods follow competitive-bid rules under PAL 1209/1265-a.
MTA Board approvalCompetitive procurements above thresholds go on a monthly board-approval list and require a majority vote — a structural gate to factor into deal timelines for any large technology award.
Single-source / emergencyAvailable only from a single responsible source or under emergency/critical need, with public notice of intent required — narrow exceptions, not a primary route.
Agency-level procurementsBuys also run through individual agencies (NYC Transit, LIRR, Metro-North, Bridges & Tunnels) — confirm which entity owns the requirement before pursuing.

Spend Signals

GovSpend · as of Sep 21, 2026

New York City Metropolitan Transportation Authority (MTA HQ), New York · 3-yr · CY2023–2025

$40.5M
Dell footprint — all channels (3-yr · CY2023–2025), est.
Direct $332K · via resellers ~$40.2M · Quality & Assurance Technology ~$27M, CDW ~$13.2M

Dell vs. competitors (spend, payee)

Converge Technology Solutions reseller
$63.9M
SHI reseller
$40M
Quality & Assurance Technology reseller~$27M Dell
$39.8M
Dell
$37.2M
CDW reseller~$13.2M Dell
$32.8M
Carahsoft reseller
$18.9M
HPE
$5M
ePlus reseller
$2.7M
Insight reseller
$1M

Brand footprint — all channels (est.)

Cisco
$60.5M
Dell
$40.5M
HPE
$6.7M
Apple
$476K

Higher of two conservative lenses: product-name match · manufacturer tag. Both undercount — treat as floors.

Open bids / RFPs

SolicitationDue
DarkTrace Renewal
New York City Metropolitan Transportation Authority
Sep 24, 2026
Bus Radio Systems Maintenance
New York City Metropolitan Transportation Authority
Sep 29, 2026
MTA All-Agency Technology Hardware Managed Services
New York City Metropolitan Transportation Authority
Sep 30, 2026
TBTA Automated Enforcement Programs
New York City Metropolitan Transportation Authority
Oct 2, 2026
RFI-NGT-1 Next-Generation Customer Information Communications System Technology for MTA’s Subway Stations
New York City Metropolitan Transportation Authority
Oct 15, 2026

Power Structure

Decision-makerWhy they matter
Janno Lieber
Chair & CEO, MTA
Top of the house since January 2022; sets strategy and is the public face of the capital program and congestion pricing. The executive relationship for any enterprise-scale motion.
Rafail Portnoy
Chief Technology Officer
CTO since 2020; owns information and operational technology across the subway and six agencies — internal tech, cybersecurity, AI analytics, and customer-facing systems. The central technology relationship.
MTA Board
Governing board (state/local nominees)
Approves major contracts and the capital program via monthly action items — the approval gate for large technology awards.
Office of the CTO — Cybersecurity / OT
Cybersecurity & OT security leadership
Runs the OT Cybersecurity Program and enterprise security; the buying center for OT/IT security as signals, tolling, and power systems modernize. Confirm the current named security lead before engaging.
MTA Construction & Development
Capital delivery (incl. CBTC)
Delivers the signal-modernization and major capital projects where most OT/infrastructure technology is embedded. Also runs the public Capital Program Dashboard (capitaldashboard.mta.info).
Jessie Lazarus
Head of the Rolling Stock Program
Named February 2026 to build and lead a new organization directing the MTA's ~$12B rolling-stock strategy from the 2025–2029 plan (incl. the up-to-2,390-car R262 order and the $1.5B R268/Kawasaki award). A capital buying center touching onboard systems, testing, and fleet data.

News & Signals

Sep 2026
ProcurementFleet
MTA issues RFP for 650 CNG buses (~$100M+) as EV bus transition stalls; capital-funded
The MTA issued solicitation B40722 for 650 low-floor 40-foot compressed-natural-gas buses for NYC Transit and MTA Bus Co., its largest single bus-fleet upgrade since 2013, valued at more than $100M and funded entirely through the $68.4B 2025-2029 capital program, with proposals due Oct. 19. The MTA frames CNG as a cheaper, lower-emission alternative to diesel while the electric-bus market matures, and the capital plan still allocates $797.1M for 500 zero-emission buses, $589.4M for charging infrastructure and $12.1M for bus technology. For a Dell SLG seller this is active large-fleet procurement with attached bus-technology and depot-infrastructure spend, plus a shift in the timing of the fleet-electrification roadmap.
Sep 2026
Capital-ProgramInfrastructure
MTA issues RFQ for final Second Avenue Subway Phase 2 construction contract (track, signaling, station build-out)
On Sept. 14, Gov. Hochul announced the MTA has begun seeking firms for the fourth and final construction contract of the Second Avenue Subway's Phase 2 extension to 125th St. — the largest single piece of the ~$7B project — with a 'request for qualifications' to establish a qualified-bidder list ahead of an expected mid-2027 award. The work explicitly includes laying tracks, setting up signaling systems, and building out station interiors. For a Dell SLG seller, a major capital-delivery procurement with substantial signaling/OT and systems-integration scope signals sustained demand for the compute, networking, cybersecurity, and data infrastructure underpinning MTA capital projects and modernization.
Sep 2026
CapitalLeadership
Lieber: Interborough Express at least five years from service; design phase ahead of schedule
At a Sept. 9 IBX event with Gov. Hochul, Chair and CEO Janno Lieber said the $5.5 billion light-rail line will take at least five years, while design is ahead of schedule. The project is half funded ($2.75 billion) in the 2025-2029 Capital Plan, with the remainder unidentified, which shapes when station systems and technology procurements materialize.
Aug 2026
AuditProcurementCapital
State Comptroller audit: MTA unlikely to meet 2040 zero-emission bus fleet target
DiNapoli's audit found the MTA is unlikely to replace its 5,800-bus fleet with zero-emission buses by 2040, citing reliance on a single manufacturer with limited capacity; the MTA cut its Stage 2 order from 1,000 buses to 500 and estimates full replacement at $11.9 billion. The audit also flags delays in upgrading depot power capacity, signalling scrutiny of fleet procurement and depot charging infrastructure.
Jun 2026
FundingCapital
Congestion pricing survives federal challenge; funding stream holds
A March 2026 federal ruling found USDOT could not rescind approval, and the tolling program keeps operating — netting ~$562M in year one and backing ~$15B in capital financing. A possible Second Circuit appeal keeps some uncertainty, but the near-term funding backdrop for technology-heavy capital work is intact.
Jun 2026
OTSignal ModernizationProcurement
MTA expands CBTC signal-modernization pipeline (6th Ave / 63rd St / DeKalb)
A two-step design-build RFP (Contract S48020) to replace fixed-block signaling with CBTC on the 6th Ave and 63rd St lines and DeKalb interlocking, plus a consultant award to support the program, keeps the flagship OT-modernization track active — edge compute, networking, and cybersecurity at a safety-critical layer.
Jun 2026
DataCapital
MTA advances public Capital Program Dashboard (Q2 2026 update)
C&D's redesigned dashboard (capitaldashboard.mta.info) now covers project bundles, rolling-stock and in-house construction with budget/spend/schedule data — a data-transparency and analytics initiative that signals where capital dollars, including technology, are moving.
Mar 2026
CapitalModernizationOT
MTA launches its largest-ever rolling-stock procurement (up to 2,390 R262 cars)
An RFP for up to 2,390 R262 subway cars (replacing ~35% of the fleet, proposals due Sept 2026) plus a $1.5B R268/Kawasaki award, run through a new Rolling Stock Program, opens a multi-year fleet-modernization wave touching onboard systems, testing, and fleet data.
Dec 2025
PaymentsData
MetroCard sales end; OMNY becomes the sole fare system
Completes the multi-year fare-tech transition; 90%+ of riders on OMNY, with the supporting payments and data platform now the system of record. MetroCard and cash acceptance are set to sunset later in 2026 (date to be announced).
Jun 2025
CapitalBudget
MTA Board approves $68.4B 2025–2029 Capital Plan
Record-size, state-of-good-repair-heavy plan funds years of signal, station, power, and rolling-stock work — the spending backdrop for OT and infrastructure technology pursuits.