All States Pennsylvania

Mid-Atlantic · SLG Market Intelligence

Pennsylvania

A first-in-the-nation government AI program, a $90B+ wave of AI data-center investment, and a $1.16B broadband buildout — Pennsylvania is one of the most active SLG technology markets in the country.

Last updated Oct 1, 2026
$50.8B2026–27 Enacted BudgetCOSTARS / DGSPrimary IT Vehicle3,000+Gov AI Users$1.16BBEAD Broadband

Top Accounts in Pennsylvania

2 accounts · market intel companion

Executive Summary

$50.8B17
2026–27 Enacted Budget
Signed July 12, 2026; $2.5B below governor's proposal
3,000+4
State employees on gen-AI
Across 35 agencies; +6,500 in training
~$90B8
AI data-center investment wave
Announced/underway across PA
$1.16B7
BEAD broadband
$793.4M provisionally approved

Pennsylvania is one of the most dynamic SLG technology markets in the country right now, and three forces define it. First, the Shapiro Administration ran the nation's first state-government generative-AI pilot (ChatGPT Enterprise with OpenAI and Carnegie Mellon) and in April 2026 expanded AI to 3,000+ employees across 35 agencies under a new Generative AI Governing Board — agencies are actively operationalizing AI and need governed infrastructure. Second, a roughly $90B wave of AI data-center investment is landing in the Commonwealth, anchored by Amazon's $20B commitment and the $10B Homer City gas-powered campus, making PA national-scale AI infrastructure. Third, the central technology buy runs through the Department of General Services' COSTARS cooperative program and statewide contracts, with the Office of Administration (OA-OIT) setting enterprise IT and security policy. Budget timing is improving but still not on-cycle: the 2025–26 budget landed 135 days late ($50.1B, signed Nov 12, 2025); the 2026–27 budget was signed July 12, 2026 — 12 days after the July 1 fiscal-year start — at $50.8B, roughly $2.5B below Shapiro's $53.3B proposal, with no new taxes and no Rainy Day Fund draw. It adds $10M for Commonwealth cybersecurity infrastructure, but a broader push to tie the data-center tax exemption to Shapiro's GRID standards stalled, leaving only a modest energy/water reporting mandate. Shapiro then acted on his own: Executive Order 2026-05 (Aug. 18, 2026) ties state data-center permits to the GRID standards and local approval and removes data centers from Fast Track permitting.

Where Dell can play
  • AI-infrastructure / 'AI factory' demand tied to the $90B+ PA data-center boom (PowerEdge, networking, services) plus university research computing.
  • Governed AI for state agencies expanding from 3,000 toward enterprise scale — private/on-prem options for sensitive workloads under the new AI Governing Board.
  • NIST-aligned endpoint and security refresh as SB 377 pushes NIST standards into IT procurement.
  • Client, endpoint, and lifecycle modernization across ~80,000 executive-branch employees and the CODE PA digital-services push.

Dell Action Plan

  • Lead the AI-infrastructure conversation: tie Dell ISG / AI Factory offerings to PA's ~$90B data-center wave and to Penn State / PASSHE research-computing buyers.
  • Position governed, private/on-prem AI for sensitive agency workloads as the gen-AI program scales past 3,000 users under the new Governing Board.
  • Lead endpoint and security refresh with NIST-aligned lifecycle controls to align with SB 377's procurement direction.
  • Validate Dell's COSTARS and DGS statewide-contract coverage and reseller registration are current for the agencies and locals you're targeting.
  • The FY2026-27 budget is now enacted ($50.8B, signed July 12) — engage agencies off final appropriations, and watch for a September return to data-center GRID legislation that could reset AI-infrastructure incentive economics.

Budget & Fiscal

Pennsylvania budgets annually on a July 1 fiscal year. The 2025–26 General Fund budget of $50.1B was signed November 12, 2025 — 135 days late. The 2026–27 General Fund budget of $50.8B was signed July 12, 2026 — a marked improvement in timing (12 days into the new fiscal year vs. 135 days late the prior cycle) — with no new taxes and no Rainy Day Fund draw. There is no single 'state IT budget' line; technology spend is distributed across agencies, the Office of Administration's enterprise IT services, and named digital and broadband initiatives.

$50.8B17
2026–27 General Fund
Enacted July 12, 2026
$11.55M1
CODE PA budget
Up from $8.24M prior year
~80,0003
Executive-branch employees
OA-supported IT footprint
Technology & security funding this biennium
BEAD broadband (federal, via PBDA)
$793.4M provisionally approved
$1.16B
CODE PA (digital experience)
2025–26 enacted
$11.55M
  • The 2025–26 budget was enacted 135 days late; the 2026–27 budget enacted July 12, 2026 improved on that but was still 12 days past the July 1 start — confirm appropriation status before forecasting against agency timelines.
  • BEAD is federal infrastructure money administered by the PA Broadband Development Authority, not General Fund IT spend — different buyers and rules.
  • Shapiro's original FY2026-27 proposal (per NASBO, Feb 2026) sought $53.3B general fund and a $4.58B rainy-day draw; the enacted $50.8B budget came in $2.5B lower and drew nothing from reserves, leaving roughly $8B in reserve as of July 1, 2027.

Initiatives & Policy

Statewide Generative AI Expansion4

Scaling

Pennsylvania ran the first state-government gen-AI pilot (ChatGPT Enterprise with OpenAI and Carnegie Mellon's Block Center); pilot employees saved ~95 minutes a day. In April 2026 the Shapiro Administration expanded AI to 3,000+ employees across 35 agencies, with 6,500 more in training, under a new Generative AI Governing Board. A clear opening to lead with governed, private/on-prem AI for sensitive workloads as adoption scales.

Dell fit75
Budget strength65
AIOpenAIGovernance

AI Data-Center & Energy Buildout8

Restricted by executive order

A ~$90B investment wave is landing in PA: Amazon's $20B commitment (incl. a campus beside the Susquehanna nuclear plant), the $10B Homer City gas-powered AI campus on a retired coal site, and CoreWeave's $6B Lancaster build. PA's natural-gas and nuclear power plus its RGGI exit are pitched as energy advantages. But Executive Order 2026-05 (Aug. 18, 2026) now ties state data-center permits to Shapiro's GRID standards and local approval and removes data centers from Fast Track permitting. Still the largest source of Dell ISG / AI-infrastructure demand in the state, now slower and more conditional.

Dell fit90
Budget strength85
AI InfrastructureData CentersEnergy

BEAD Broadband Deployment7

Awards in progress

PA's $1.16B BEAD program (via the PA Broadband Development Authority) closed its final application round in August 2025; the board provisionally approved $793.4M in grants pending NTIA sign-off. Aimed at universal high-speed access by decade's end. Mostly a fiber/ISP motion, but it signals sustained network and edge investment statewide.

Dell fit45
Budget strength80
BroadbandFederalInfrastructure

SB 377 — NIST Standards in IT Procurement9

Stalled in House

SB 377 (Phillips-Hill) passed the Senate 49-0 in June 2025, requiring procured endpoint devices and related services to meet NIST cybersecurity guidelines or industry best practices. It was laid on the table in the House in October 2025 and has not advanced since — not enacted as of June 2026. Still signals legislative intent toward a NIST baseline in Commonwealth IT contracting, favorable to vendors who can document NIST-aligned endpoint security and lifecycle controls.

Dell fit70
Budget strength40
SecurityProcurementNIST

Procurement & Competition

The Department of General Services (DGS) runs central procurement, including the COSTARS cooperative purchasing program ('Cooperative Sourcing to Achieve Reductions in Spend'), which lets registered local governments, school districts, and state-affiliated entities buy from DGS-established contracts — including IT hardware and software — without running their own RFP. The Office of Administration (OA-OIT) sets enterprise IT strategy, security policy, and shared services for the ~80,000 executive-branch employees under the Governor's jurisdiction.

Vehicle / gateWhat it means for Dell
COSTARS Cooperative PurchasingPrimary cooperative vehicle via DGS for local gov, schools, and state-affiliated entities. Covers IT hardware/software. Confirm Dell agreements and reseller registration are current.
DGS Statewide ContractsPre-competed Commonwealth contracts for IT commodities and services used by executive agencies.
OA-OIT Enterprise IT ServicesShared infrastructure, security policy, and IT operations for executive-branch agencies — sets standards a winning offer must meet.
Key buying entityRole
Office of Administration (OA-OIT)Enterprise IT strategy, security, and shared services; home of the CIO and gen-AI program.
Department of General Services (DGS)Central procurement and COSTARS cooperative — the statewide buying motion.
Department of Human Services / large agenciesAmong the largest agency IT and data-modernization spenders.
Penn State, PASSHE & state-related universitiesLarge, largely independent research-computing and AI-infrastructure buyers.
Competitive landscape

Pennsylvania is a contract-driven market where COSTARS and DGS statewide contracts shape access and incumbents hold positions across compute, client, and networking. Differentiation tends to come from AI-infrastructure capability tied to the data-center wave, NIST-aligned security (SB 377), and governed AI for agencies rather than price alone.

Power Structure

Decision-makerWhy they matter
Josh Shapiro4
Governor · Commonwealth of Pennsylvania
Champions the gen-AI program and the AI data-center/energy agenda; drove the RGGI exit as an energy play.
Bry Pardoe5
Deputy Secretary for IT / Commonwealth CIO · Office of Administration (OA-OIT)
Named CIO Oct 2025 (made permanent same month); former CODE PA executive director. Confirmed on the OA leadership page as of June 2026 with the title 'Deputy Secretary for Information Technology - Chief Information Officer.' Owns enterprise IT and cybersecurity direction; CTO Greg Fiedler (named March 2026) leads the Enterprise Technology Services Office under her. Her former CODE PA role is now held by Sara Hall (named Feb 2026).
Andy Ritter15
Commonwealth CISO · Office of Administration (OA-OIT)
Named permanent State CISO Feb 4, 2026 after serving interim since Oct 2025; prior deputy CISO from Jan 2024. Part of a Feb 2026 wave converting four acting IT roles to permanent (also exec deputy CIO Jim Sipe and CODE PA director Sara Hall). Owns Commonwealth cybersecurity policy — the buyer for NIST-aligned endpoint/security positioning.
Neil Weaver4
Secretary of Administration · Office of Administration
Leads OA (HR, IT, records) for ~80,000 employees; confirmed as Secretary on the OA leadership page as of June 2026; public face of the AI governance push.
PA Broadband Development Authority (PBDA)
Broadband program owner · Commonwealth of Pennsylvania
Administers the $1.16B BEAD program and grant awards.

News & Signals

Sep 2026
Data CenterBudgetPolicy
Investigation: Amazon claiming PA data-center sales-tax exemption (~$2B cost by 2031) as bipartisan repeal push resumes24
A Capital & Main investigation reported that Amazon — which pledged $20B in Pennsylvania data centers — has already claimed the state's 6% data-center sales/use-tax exemption at two locations and is expanding (a permit application for 36 data centers at a 4.5 GW gas-powered Homer City campus, plus sites in Hazle/Kline townships), even as the exemption is projected to cost the state close to $2B by 2031 ($188.4M in FY2026-27 alone). Both chambers passed repeal versions in June but none reached Gov. Shapiro; a repeal was omitted from his Aug. 18 GRID executive order, and lawmakers signal a fall push. For a Dell SLG seller it sharpens the fiscal and political scrutiny around Pennsylvania's data-center incentives, shaping project economics and the state's revenue posture for IT investment.
Sep 2026
Data-CenterEnergyPolicy
PUC-commissioned Synapse report warns PA data-center demand could threaten grid reliability (brownout/blackout risk)23
An independent report written for the PUC by Synapse Energy Economics warned that rapidly rising electricity demand from large AI and cloud data centers could strain grid reliability in the PJM region, with a top Shapiro administration official noting developers have had at least preliminary DEP conversations on about 55 projects, of which 16 have filed permit applications. The findings underpin the PUC's new rulemaking and technical-conference push. For a Dell SLG seller, escalating grid-reliability scrutiny tied to data-center load reinforces demand for energy-efficient infrastructure and signals a tighter, more scrutinized siting/permitting environment for large compute in Pennsylvania.
Sep 2026
Data-CenterPolicyEnergy
PA Public Utility Commission votes 5-0 to update emergency load-control rules, sets fall technical conference on data-center cost responsibility22
The Pennsylvania PUC unanimously approved Vice Chair Kimberly Barrow's motion directing staff to develop proposed updates to the state's emergency electric-load-control regulations (clarifying when large customers may be curtailed) and to hold a fall technical conference examining cost responsibility for large computational loads, including data centers; a Tentative Order is targeted for the Oct. 1, 2026 meeting and a final order for Jan. 28, 2027. The action follows Gov. Shapiro's Aug. 18 EO 2026-05 encouraging the PUC to examine curtailment and data-center cost allocation. For a Dell SLG seller, tightening curtailment and cost-allocation rules shape the economics, energy assurance, and siting pace of large AI/data-center loads in Pennsylvania and reinforce a more governed infrastructure environment.
Aug 2026
BudgetDigital-ServicesCybersecurity
OA's first IT Day in PA highlights $3.7M for CODE PA to modernize DEP permitting21
At OA's first annual IT Day in PA, Secretary Neil Weaver highlighted the added $10M for cybersecurity in the 2026-27 budget, and OA noted the budget also includes $3.7M for CODE PA to modernize permitting with DEP. OA says it and CODE PA have saved a combined $37M on IT. That points to funded permitting-modernization work and a cost-savings story sellers should align to.
Aug 2026
Data-CenterDigital-ServicesGIS
PA launches data center feedback website and GIS-based PA Data Center Permit Tracker20
Days after the executive order, the state launched a public comment site and a GIS map of proposed data center locations and environmental permit statuses. The state's website lists at least 100 proposed data centers, and StateScoop reports there are no operational AI data centers in Pennsylvania. The tracker gives sellers a public view of which projects are actually moving through permitting.
Aug 2026
Data-CenterEnergyPolicy
Shapiro signs EO 2026-05 imposing GRID requirements on data center permits19
The executive order makes DEP evaluate data center permits only when developers legally commit to the GRID Requirements and have local approval, and it pulls AI data center projects from the PA Permit Fast Track Program. AI data-center-driven infrastructure demand in Pennsylvania will slow and face more review, so sellers should re-qualify timelines on data-center-adjacent opportunities.
Jul 12 2026
BudgetCybersecurity
Shapiro signs $50.8B FY2026-27 budget — $2.5B below his proposal, +$10M for cybersecurity17
The bipartisan budget landed 12 days after the July 1 fiscal-year start (vs. 135 days late the prior cycle): $50.8B, no new taxes, no Rainy Day Fund draw, and a record $11.85B K-12 subsidy. It adds $10M in Commonwealth cybersecurity infrastructure funding. Appropriations are now final — agency IT and security budgets can be forecast with confidence, and the added cyber dollars are a concrete near-term opening for endpoint/security engagements.
Jul 2026
Data CentersPolicy
Final budget adds only a modest data-center reporting rule; Shapiro's GRID standards stall18
The one data-center provision that survived is a disclosure mandate for facilities using 10+ MW/year of power and water — not the GRID certification framework Shapiro proposed to condition the state's sales-tax exemption (worth an estimated $2B by mid-2031) on clean-energy and labor standards. Rep. Matzie's utility-cost-recovery bill and a local-pause bill also stalled; the Legislature may revisit in September. The ~$90B AI-infrastructure wave keeps building with its incentive structure unchanged for now — good near-term visibility for Dell ISG pursuits, but watch September for a policy shift that could reset project economics.
Jun 2026
Budget
FY2026-27 budget heads past June 30 deadline; partial appropriations signed14
House passed its version (HB 2400) 107-94 in April; Shapiro signed nine appropriations bills June 12 as a 'first step,' but Senate Republicans still cite spending concerns over the ~$53.3B plan and a final deal is expected in early July. With last year's budget 135 days late, impasse risk again compresses agency procurement timelines — confirm appropriations before forecasting.
Jun 2026
Data CentersEnergyAI
Shapiro releases full GRID data-center incentive proposal16
June 2 plan would condition PA's 6% sales-tax exemption (and Economic Opportunity Zone benefits) on 'Governor's Responsible Infrastructure Development' standards — bring-your-own-power, 32% clean energy by 2035, 200+ construction jobs, and sustainability/water plans. Tied to budget negotiations; shapes the terms of the ~$90B data-center wave Dell ISG is targeting.
Apr 2026
AI
PA expands generative AI to 3,000+ employees across 35 agencies4
Agencies are scaling AI under a new Governing Board — demand for governed, secure AI infrastructure grows.
Feb 2026
LeadershipSecurity
PA names permanent State CISO and converts four acting IT roles15
Andy Ritter named permanent Commonwealth CISO (Feb 4) after interim service; Jim Sipe (exec deputy CIO) and Sara Hall (CODE PA director) also made permanent. OA-OIT leadership now settled under CIO Bry Pardoe — a stable, named buyer set for security and AI engagements.
Feb 2026
BudgetData CentersAI
Gov. Shapiro proposed a $53.3B general-fund FY2027 budget13
$137.22B all funds; proposes a $4.58B rainy-day draw, leaving a $3.31B reserve. Recommends environmental and community protections for responsible data-center development and calls on agencies to create guidance for safe AI use.
Nov 2025
Budget
Shapiro signs $50.1B 2025–26 budget, 135 days late2
Budget finally enacted; late cycle compresses agency procurement timelines and sets up live 2026–27 talks.

Sources

  1. Technical.ly — New Pennsylvania budget invests millions in biotech, workforce and tech (CODE PA)
  2. City & State PA — 5 things to know about Pennsylvania's 2025-26 state budget
  3. PA Office of Administration — About IT (OA-OIT)
  4. PA Office of Administration — Shapiro Admin expands safe, responsible AI
  5. City & State PA — Bry Pardoe is Pennsylvania's acting CIO following IT staff changes
  6. CNBC — Amazon to spend $20 billion on data centers in Pennsylvania
  7. PA Broadband Development Authority — ~$800M in BEAD grants provisionally approved
  8. Data Center Frontier — Pennsylvania's $90 Billion AI infrastructure investment wave
  9. PA General Assembly — Senate Bill 377 (2025-2026, NIST IT procurement)
  10. Construction Review Online — Former Homer City plant to become $10B AI data center campus
  11. DGS — COSTARS Cooperative Purchasing
  12. StateScoop — Pennsylvania expanded generative AI to 3,000 employees
  13. NASBO — Summaries of FY2027 Proposed Budgets (June 2026)
  14. City & State PA — 2026-27 Pennsylvania state budget tracker
  15. GovTech — Pennsylvania Names Andy Ritter as Permanent State CISO
  16. Spotlight PA — Shapiro releases full PA data center incentive proposal (GRID)
  17. Commonwealth of Pennsylvania — Governor Shapiro Signs Bipartisan 2026-27 Budget (July 12, 2026)
  18. Spotlight PA — PA added just one regulation for data centers in budget (July 2026)
  19. Commonwealth of Pennsylvania — Governor Shapiro Signs Executive Order on Data Center Development in PA
  20. StateScoop — Data-center tracker website shows status of builds in Pennsylvania
  21. PA Office of Administration — Governor Shapiro Secures New Funding to Continue Modernizing, Securing Online Services
  22. BCTV — Public Utility Commission Moves to Address Data Center Impacts on Electric Reliability and Consumer Costs
  23. PennLive — Pennsylvania grid reliability at risk as data center boom drives demand
  24. Capital & Main — Pennsylvania's Amazon Data Center Boom Is Fueled by a Lucrative Tax Break